The Mechanics of Spunbond Extrusion and Filament Formation
At the heart of every spunbond production line lies the extrusion system, which is responsible for transforming raw polymer pellets—typically Polypropylene (PP) or Polyester (PET)—into a molten state suitable for spinning. The process begins in the dosing unit, where main raw materials and additives (such as color masterbatches or UV stabilizers) are mixed with high precision. This mixture is fed into the main screw extruder. The design of the screw is critical; it must generate sufficient shear force and heat to melt the polymer homogeneously without degrading its molecular structure.
Melt Filtration and Metering
Once melted, the polymer flows through a continuous screen changer to remove any impurities that could clog the spinnerets. This is a vital step for maintaining line uptime and fabric uniformity. Following filtration, a gear pump (metering pump) takes over. This positive displacement pump ensures a constant, pulse-free flow of molten polymer to the spin beam. The precision of this pump directly dictates the uniformity of the filament denier across the entire width of the web. Variations in pressure here can lead to defects in the final roll, making the synchronization between extruder speed and pump speed a primary control loop in the production logic.
The Spinning Beam and Quenching Process
The molten polymer enters the spin beam and is forced through a spinneret plate containing thousands of microscopic holes. As the filaments exit these holes, they are immediately subjected to a stream of cool air in the quenching chamber. This rapid cooling solidifies the fibers. Simultaneously, a high-velocity air stream stretches (draws) the filaments. This aerodynamic drawing aligns the polymer chains, significantly increasing the tensile strength of the fiber. The management of air temperature and velocity in the quenching chamber is the defining factor in determining the fiber diameter and the softness of the resulting nonwoven fabric.
Web Formation and Thermal Bonding Systems
After the filaments are drawn, they are deposited onto a moving porous conveyor belt, often referred to as the wire mesh. A suction system beneath the belt creates a vacuum that pins the filaments down, creating a randomized web structure. The randomness of this laydown is what gives spunbond fabric its isotropic strength properties. To ensure uniform coverage, the suction pressure must be balanced across the machine width; uneven suction can result in light spots or "cloudiness" in the fabric.
The loose web of fibers is then transported to the thermal calender. The calender consists of two heated rollers: one smooth and one engraved with a bonding pattern (points, diamonds, or ovals). Heat and pressure melt the fibers at the specific points of contact, welding them together to form a cohesive fabric.
- Engraved Roller Temperature: This must be precisely controlled (usually within ±1°C). If too cool, the fabric fuzzes; if too hot, the fabric becomes brittle and film-like.
- Nip Pressure: Hydraulic pressure determines the depth of the bond. Higher pressure yields higher tensile strength but reduces the "hand feel" or softness.
- Bond Area Percentage: The design of the engraving determines how much of the fabric surface is bonded, typically ranging between 12% and 25% depending on the application.
Analyzing Line Configurations: S, SS, and SMS
Spunbond production lines are modular, and the configuration of the spinning beams determines the market capabilities of the machine. A single beam (S) line is the simplest form, but modern demands for speed and coverage often require multiple beams. The industry standard has shifted toward multi-beam setups to improve barrier properties and production speed.
| Configuration | Structure | Primary Applications |
| Single S | One Spunbond Beam | Packaging, agriculture covers, disposable tablecloths. |
| Double S (SS) | Two Spunbond Beams | Hygiene top-sheets, furniture lining, higher tensile requirements. |
| SMS / SMMS | Spunbond + Meltblown + Spunbond | Medical gowns, surgical drapes, high-barrier diapers, filtration. |
In an SMS configuration, the inclusion of Meltblown beams adds a layer of ultra-fine fibers between the stronger Spunbond layers. This "sandwich" structure provides liquid and particulate barrier properties while maintaining the strength of spunbond. Operators must balance the airflow of the meltblown section carefully, as these fine fibers are easily disrupted by the turbulent air of the adjacent spunbond beams.
Operational Efficiency and Maintenance Protocols
Maximizing the return on investment for a spunbond production line requires rigorous attention to operational efficiency. Energy consumption is a major cost driver, particularly in the heating of the extruder and the generation of compressed air for the drawing unit. Modern lines utilize closed-loop energy recovery systems where heat from the quenching air is recycled to pre-heat the intake air for the extruder, significantly reducing the electrical load.
Critical Maintenance Checks
Consistent fabric quality relies on the cleanliness and mechanical integrity of the line components. Neglecting maintenance leads to "shots" (blobs of polymer) in the fabric or uneven basis weight profiles.
- Spinneret Cleaning: The capillaries in the spinneret plate can accumulate carbonized polymer over time. Regular vacuum cleaning or ultrasonic bath cleaning cycles are required to prevent filament breakage.
- Calender Roller Care: The engraved pattern must be inspected for damage. Even minor scratches on the roller can repeat a defect every rotation, resulting in thousands of meters of scrap material.
- Belt Cleaning: The conveyor belt is porous to allow suction. If polymer drips or dust clogs the mesh, suction efficiency drops, leading to poor web formation. High-pressure water jets or continuous brush cleaning systems are standard on high-speed lines.







English
中文简体
русский
عربى




